The East Wing roof is complete and now work starts on the South Wing roof which is a lengthier and more complex operation and hence much more costly; all the existing slates must be carefully removed to minimise damage and reduce replacement costs.

The East Wing [sounds grand donit]  interior is being painted and the roof has to be insulated inside by a sprayed on material, and all the services installed.

The pic below of the waterside of the building shows the bricked up doorway that will eventually be opened up for access for materials to and from a barge.